Musical Fountain at Gandhi Udhyan
Start Date:
17/07/2020
End Date:
16/10/2020

Description:

The walkover musical fountain system has been installed in Gandhi Udhyan to create a more...

Smart Classes (Ph I & II)
Start Date:
19/11/2020
End Date:
25/08/2021

Description:

Existing classes are converted into smart classes in various Govt. schools. To upgrade the ..

Music System at Gandhi Udhyan
Start Date:
06/07/2020
End Date:
06/11/2020

Description:

To install speaker on the ground along the total walking track of Gandhi Udyan, which is around 1 km.

Solar Tree
Start Date:
24/05/2020
End Date:
28/02/2021

Description:

6 Solar Trees which will include benches below the tree for resting and waiting.

Open Gym in various parks
Start Date:
14/10/2019
End Date:
13/04/2021

Description:

Bareilly Smart City has installed Open Gyms in 25 parks of city. In each open gym...

Illumination of Dark Spaces in ABD
Start Date:
04/07/2020
End Date:
06/03/2021

Description:

Under this project 24 high mast lights are installed within ABD area 8 lights of 180 watts and 4 light

Solar Rooftop Panel
Start Date:
02/06/2020
End Date:
01/12/2021

Description:

This project will focus to use and promote the renewable energy under this project Bareilly Smart city

Charging Station
Start Date:
17/04/2021
End Date:
31/08/2021

Description:

Construction of Charging station for 25 Nos of Electric buses under Fame scheme of Government of India

Supply of Heavy Tipper Machine
Start Date:
05/02/2021
End Date:
10/03/2021

Description:

Under this project, 5 Nos of heavy tippers were procured for efficient management of solid waste.

Supply of Supper Sucker Machine
Start Date:
12/03/2021
End Date:
30/06/2021

Description:

Under this project, a Super Sucker type de-silting machine with 2 Nos of dump tank

Organic Waste Composter
Start Date:
22/03/2021
End Date:
30/08/2021

Description:

Under this project 5 Nos of organic waste composter have been procured

Skid Loader
Start Date:
26/07/2021
End Date:
15/10/2021

Description:

Under this project 4 Nos of Skid loaders were purchased. Each skid loader bucket capacity is 0.4 CUM

Installation of 0.5 MLD De-STP at SCH Pond for rejuvenation of SCH pond
Start Date:
14/02/2021
End Date:
30/11/2021

Description:

Under this project 500 KLD De-Centralized STP has been installed

Integrated Command
Control Centre
Start Date:
23/09/2020
End Date:
30/12/2021

Description:

Integrated Command and Control Centre (ICCC) established in Bareilly.

Transfer
Station
Start Date:
10/01/2021
End Date:
30/12/2022

Description:

This project is the part of Transfer station civil, under this project 5

Park Beautification at Various Locations
Start Date:
07/01/2022
End Date:
28/03/2022

Description:

Beautification of parks with External lighting, Decorative lighting poles

Development of road under Shyamatganj flyover BSCL
Start Date:
02/08/2021
End Date:
28/03/2022

Description:

This project is basically development of Road under Shyamatganj.

Mirror Maze at
Gandhi Udhyan
Start Date:
07/01/2022
End Date:
28/03/2022

Description:

A walk-through optical illusion adventure is a fascinating experience

Laser Fountain at
Akshar Vihar
Start Date:
07/01/2022
End Date:
28/03/2022

Description:

Multimedia shows on water screen as proposed for above sites.

Light and Sound
show
Start Date:
07/01/2022
End Date:
28/03/2022

Description:

District Jail is one of the oldest jails of the Bareilly region.

Tube well and automation
Start Date:
07/07/2021
End Date:
28/03/2022

Description:

Automation of 94 Nos tube wells and 42 Nos overhead tanks SCADA system shall be monitored

She Lounge
Start Date:
23/05/2021
End Date:
31/07/2022

Description:

The She-Lounges are proposed to be installed at the most accessible places in the city

Renovation of Akshar Vihar Lake area
Start Date:
01/07/2021
End Date:
28/03/2022

Description:

Rejuvenate the area around the Pond and develop the area for recreational purposes

Signages under Bareilly Heritage
Start Date:
07/09/2021
End Date:
28/03/2022

Description:

Bareilly has rich Heritage and Architecture. Information Signage at 20 locations.

Facade Lighting
Start Date:
01/11/2021
End Date:
28/03/2022

Description:

Under this project surface mounted color changing Luminaire & Projector light of varying flux ranges,

Construction of RCC drain from kargaina police chowki to existing culvert at chainage1600 Bareilly
Start Date:
14/08/2021
End Date:
15/07/2022

Description:

Construction of RCC drain of 1.60 Km from kargaina police chowki.

Ghantaghar Redevelopment
Start Date:
09/08/2021
End Date:
31/07/2022

Description:

Renovation of Park and MS Railing at the park boundaries to provide clear view.

Beautification of Gandhi Udyan
Start Date:
04/01/2022
End Date:
31/07/2022

Description:

Renovation of Non-functional fountain and construction of pathway. The beautification of Gandhi Udyan

SCH & Pond Complex External Development at Bareilly
Start Date:
14/02/2021
End Date:
30/11/2021

Description:

The pond adjacent to the hall is one of the three surviving water bodies (ponds) within the city limits.

Puzzle type multilevel car parking of Electromechanical technology
Start Date:
04/01/2022
End Date:
30/10/2022

Description:

Bareilly smart city is committed to provide the smart solutions, BSCL came with an innovative idea .

Construction of Smart Vending Zone (Allen Club)
Start Date:
15/11/2021
End Date:
30/10/2022

Description:

205 nos. Vegetable vending Stalls, Entrance Gate way, RO Plant and drinking water unit in 2 locations.

Design, const. & installation of Smart Toilets (12)
Start Date:
24/12/2020
End Date:
30/10/2022

Description:

Sensor Based Flush and Sensor Based Automatic Lighting, Waterless Operations for Urinals, Female/ Male.

Internal Roads Phase 1
(11.2 km)
Start Date:
30/04/2021
End Date:
30/10/2022

Description:

Bareilly Smart city redeveloped the existing internal roads with drain, ambient lighting, footpath.

Foot over bridge (FOB) at district hospital at Bareilly
Start Date:
15/07/2021
End Date:
15/12/2022

Description:

District hospital is divided in two wings (Operation ward and ICU) along the both side of roads.

Nagar Nigam
Library
Start Date:
01/11/2021
End Date:
30/12/2022

Description:

Existing library has been updated as smart library with the seating capacity of 50 peoples

E-kiosk /
Smart Kiosk (2 no)
Start Date:
11/05/2021
End Date:
30/12/2022

Description:

Construction of e-kiosk for citizen facility center with shops and advertisement area.

Women
Helpdesk
Start Date:
07/09/2021
End Date:
30/12/2022

Description:

AC Waiting area with adequate and comfortable seating arrangements’ Feeding Cabin, Lockers Clean toilets.

Underground Cabling of LT and HT cables
Start Date:
15/04/2022
End Date:
15/03/2022

Description:

Bareilly smart city undergrounded the LT & HT cables of ABD area. This project is implemented in 5 phase.

Renovation of Maulana Azad Inter College
Start Date:
30/04/2021
End Date:
31/03/2023

Description:

Construction of G+1 Building at maulana Azad college to facilitate students with updated infrastructure.

Rifle
Club
Start Date:
20/11/2021
End Date:
15/04/2022

Description:

Construction of 50 m Outdoor Shooting Range, 25 m Outdoor Shooting Range, 10 m.

SWM
Workshop
Start Date:
15/04/2022
End Date:
22/03/2022

Description:

Landscape scope includes procure, supply, construction, installation, furnishing.

Commercial Complex at
Tanga Stand
Start Date:
05/01/2022
End Date:
22/03/2022

Description:

Developed Shopping areas of different sizes, Parking spaces for 2 wheelers and 4 wheelers

Major road Phase 1
(5.62 Km)
Start Date:
29/06/2021
End Date:
31/03/2023

Description:

Construction of road, drains, smart road and junction development with ambient lighting.

Major Road phase 2
(8.10 km)
Start Date:
08/07/2021
End Date:
31/03/2022

Description:

Construction of road, drains, smart road and junction development with ambient lighting.

Incubation Centre, & Auditorium at GIC, Bareilly
Start Date:
07/10/2021
End Date:
30/09/2023

Description:

Construction of road, drains, smart road and junction development with ambient lighting.

Skywalk in Bareilly
Start Date:
15/04/2022
End Date:
30/11/2023

Description:

For achieving revitalization and development of Bareilly city, following are the objectives of sky walk.

Indoor Sports Facility
Start Date:
18/11/2021
End Date:
30/10/2023

Description:

Multipurpose Hall of size 42.5X27 Mt. Sports shall be played like: Handball, Volleyball, Basketball

Major Road Phase 3
Start Date:
23/11/2021
End Date:
30/11/2023

Description:

Construction of road, drains, smart road and junction development with ambient lighting.

Redevelopment of Urban Haat to Bareilly Haat with Handicraft Centre
Start Date:
07/09/2021
End Date:
30/12/2023

Description:

Construction of road, drains, smart road and junction development with ambient lighting.

2 Lane Elevated Corridor from Kotwali Police Station to Koharapeer
Start Date:
02/09/2022
End Date:
31/12/2023

Description:

Ghantaghar and kutubkhana is old market with very narrow passage of road cause heavy traffic jaam

3D Wall Painting
Start Date:
22/05/2023
End Date:
21/11/2023

Description:

3D mural art, is an innovative form of artistic expression that transforms flat walls into immersive, lifelike environments.

Rifle club interior work
Start Date:
21/06/2023
End Date:
20/12/2023

Description:

Project focuses on creating a functional, safe, and comfortable environment for shooting sports enthusiasts.

Food Court at DD Puram
Start Date:
14/08/2023
End Date:
13/11/2023

Description:

The construction of a food court involves creating a versatile dining space where a variety of food vendors.