Ph. No.: 0581-2550074 or write on email: ceo.bscl01@gmail.com
The walkover musical fountain system has been installed in Gandhi Udhyan to create a more...
Start Date: 17/07/2020
End Date: 16/10/2020
The walkover musical fountain system has been installed in Gandhi Udhyan to create a more interactive environment. It would appeal to kids and adults alike and set a friendly and pleasant atmosphere around the park.
Existing classes are converted into smart classes in various Govt. schools. To upgrade the ..
Start Date: 19/11/2020
End Date: 25/08/2021
Existing classes are converted into smart classes in various Govt. schools. To upgrade the level of education and infrastructure of the schools to make the academic experience more engaging and complete in the government schools
To install speaker on the ground along the total walking track of Gandhi Udyan, which is around 1 km.
Start Date: 06/07/2020
End Date: 06/11/2020
To install speaker on the ground along the total walking track of Gandhi Udyan, which is around 1 km.
6 Solar Trees which will include benches below the tree for resting and waiting.
Start Date: 24/05/2020
End Date: 28/02/2021
Solar Trees which will include benches below the tree for resting and waiting. It will also have the provision of charging sockets for mobiles and laptops. 16 Solar panels and 8 chairs in each tree. 5 KW power generated by each tree.
Bareilly Smart City has installed Open Gyms in 25 parks of city. In each open gym...
Start Date: 14/10/2019
End Date: 13/04/2021
Bareilly Smart City has installed Open Gyms in 25 parks of city. In each open gym, 14 types of gym equipment are installed for their smooth working and thus to give the people a good gym experience outdoor without any fees
Under this project 24 high mast lights are installed within ABD area 8 lights of 180 watts and 4 light
Start Date: 04/07/2020
End Date: 06/03/2021
Under this project 24 high mast lights are installed within ABD area 8 lights of 180 watts and 4 light of 250 watt in each pole. It will enhance the accessibility and safety of people of Bareilly
This project will focus to use and promote the renewable energy under this project Bareilly Smart city
Start Date: 02/06/2020
End Date: 01/12/2021
This project will focus to use and promote the renewable energy under this project Bareilly Smart city has installed solar panels in 15 government buildings of Bareilly with the total capacity of 256 KW. It will reduce the electricity consumption.
Construction of Charging station for 25 Nos of Electric buses under Fame scheme of Government of India
Start Date: 17/04/2021
End Date: 31/08/2021
Construction of Charging station for 25 Nos of Electric buses under Fame scheme of Government of India, which reduce the pollution and conventional energy use. Bareilly smart city has constructed the Civil and Electrical Infra for Charging of buses.
Under this project, 5 Nos of heavy tippers were procured for efficient management of solid waste.
Start Date: 05/02/2021
End Date: 10/03/2021
Under this project, 5 Nos of heavy tippers were procured for efficient management of solid waste in Bareilly, Capacity of each heavy tipper is 16 CUM
Under this project, a Super Sucker type de-silting machine with 2 Nos of dump tank
Start Date: 12/03/2021
End Date: 30/06/2021
Under this project, a Super Sucker type de-silting machine with 2 Nos of dump tank was procured along with dump tanks for efficient management of sludge generated in Bareilly. Truck Chassis: 28 Ton
Under this project 5 Nos of organic waste composter have been procured
Start Date: 22/03/2021
End Date: 30/08/2021
Under this project 5 Nos of organic waste composter have been procured. 3 Organic waste composter capacity of 500 Kg at Delapeer, CI park and Nagar Nigam. 2 Organic waste composter capacity of 1000 Kg at DM Compound and Swale Nagar
Under this project 4 Nos of Skid loaders were purchased. Each skid loader bucket capacity is 0.4 CUM
Start Date: 26/07/2021
End Date: 15/10/2021
Under this project 4 Nos of Skid loaders were purchased. Each skid loader bucket capacity is 0.4 CUM
Under this project 500 KLD De-Centralized STP has been installed
Start Date: 14/02/2021
End Date: 30/11/2021
Under this project 500 KLD De-Centralized STP has been installed at Sanjay Community Hall Pond, which will treat the wastewater of drain and discharge the treated water in pond, this project is linked with SCH pond development
Integrated Command and Control Centre (ICCC) established in Bareilly.
Start Date: 23/09/2020
End Date: 30/12/2021
Integrated Command and Control Centre (ICCC) established in Bareilly, aims to provide a centralized platforms to monitor multiple services. It helps City Administration making fast decision by taking inputs from various sets of analysed data provided by multiple smart elements installed across the city
This project is the part of Transfer station civil, under this project 5
Start Date: 10/01/2021
End Date: 30/12/2022
This project is the part of Transfer station civil, under this project 5 locations are constructed as transfer station with 14 Nos of Compactor, 9 Nos of Hook loader, 4 Nos of Skid loader and 3 Material Recovery Facility. Locations:- 1. Swale Nagar, 2. Delapeer, 3. CI Park, 4. Azam Nagar and 5. Dainik Jagran
Beautification of parks with External lighting, Decorative lighting poles
Start Date: 07/01/2022
End Date: 28/03/2022
Beautification of parks with External lighting, Decorative lighting poles and bollards. Electrical special RGB lighting, effect and wiring. Sculpture and artistic installations, Fountain, Decorative seating and Selfie point
This project is basically development of Road under Shyamatganj.
Start Date: 02/08/2021
End Date: 28/03/2022
This project is basically development of Road under Shyamatganj. Concept of this project is to develop the area as night market with proper roads, lighting, Graffiti etc
A walk-through optical illusion adventure is a fascinating experience
Start Date: 07/01/20212
End Date: 28/03/2022
A walk-through optical illusion adventure is a fascinating experience and life size puzzle for all ages, but this design has features tailored to appeal to children, but which adults will also enjoy. This project has artefacts (3 dimensional montages) of happy animals in cartoon style
Multimedia shows on water screen as proposed for above sites.
Start Date: 07/01/2021
End Date: 28/03/2022
Multimedia shows on water screen as proposed for above sites will be one of the latest emerging trends in entertainment industry worldwide. This consists of a Floating Musical Fountains along with one or more water screens, Laser and Video projector are used to cast images on the water screen. Water adds an extra sparkle to the brilliance of DPSS lasers and depth and three-dimensional effects. The visitors can enjoy the show and the narration which can be based on a certain interesting aspect of the history and heritage
District Jail is one of the oldest jails of the Bareilly region.
Start Date: 07/01/2021
End Date: 28/03/2022
District Jail is one of the oldest jails of the Bareilly region. To create awareness of historical events and cultural importance of the city. To strengthen the social and cultural values. To provide a place for recreation.
Automation of 94 Nos tube wells and 42 Nos overhead tanks SCADA system shall be monitored
Start Date: 07/07/2021
End Date: 28/03/2021
Automation of 94 Nos tube wells and 42 Nos overhead tanks. SCADA system shall be monitored and control directly from ICCC for real time monitoring of Tube wells and OHTs
The She-Lounges are proposed to be installed at the most accessible places in the city
Start Date: 23/05/2021
End Date: 31/07/2022
The She-Lounges are proposed to be installed at the most accessible places in the city. Facility:- 1- Seating Capacity, 6 women at a time. 2- Hygienic toilets with pad dispenser, Cool drinking water dispenser. 3- Waiting room with LED TV screens, seating. 4- Facility for wheel chair and first aid. 5- Facility for adequate number of free mobile phone charging points.
Rejuvenate the area around the Pond and develop the area for recreational purposes
Start Date: 01/07/2021
End Date: 28/03/2022
Rejuvenate the area around the Pond and develop the area for recreational purposes. Prevent water logging in the surrounding areas. Restart the boating activities in the Pond and Installation of Jetty (T Shape). Construction of Drain of 1.26 km from Akshar Vihar to Jat Regiment Culvert
Bareilly has rich Heritage and Architecture. Information Signage at 20 locations.
Start Date: 07/09/2021
End Date: 28/03/2022
Bareilly has rich Heritage and Architecture. Information Signage at 20 locations are installed to showcase the heritage and historical importance of Bareilly. To create awareness to citizens and tourists visiting Bareilly about its history and heritage
Under this project surface mounted color changing Luminaire & Projector light of varying flux ranges,
Start Date: 01/11/2021
End Date: 28/03/2022
Under this project surface mounted color changing Luminaire & Projector light of varying flux ranges with controller, having anti-glare submitted. stabilizer, DMX splitter, Lighting control software, LED Driver, Signal Amplifier, Decoder etc. Location:- Nagar Nigam , Methodist Church & Kotwali
Construction of RCC drain of 1.60 Km from kargaina police chowki.
Start Date: 14/08/2021
End Date: 15/07/2022
Construction of RCC drain of 1.60 Km from kargaina police chowki along Badaun road.
Renovation of Park and MS Railing at the park boundaries to provide clear view.
Start Date: 09/08/2021
End Date: 31/07/2022
Renovation of Park and MS Railing at the park boundaries to provide clear view. Landscaping Elements with Shrubs and trees ,Stone Pathways inside the Park for morning visitors. Geyser Jet Fountain Repair of the Clock tower Works. Road Top Layer around the site and Pedestrian Pathways outside the park for the Adjacent Road
Renovation of Non-functional fountain and construction of pathway. The beautification of Gandhi Udyan
Start Date: 04/01/2022
End Date: 31/07/2022
Renovation of Non-functional fountain and construction of pathway
The pond adjacent to the hall is one of the three surviving water bodies (ponds) within the city limits.
Start Date: 14/02/2021
End Date: 30/11/2021
The pond adjacent to the hall is one of the three surviving water bodies (ponds) within the city limits. The pond and its surroundings have the potential of becoming an interactive social space for community bonding and attracting tourists and citizens that the Sanjay Community Hall could cater to with space for large gatherings as well as high-end restaurants.
Bareilly smart city is committed to provide the smart solutions, BSCL came with an innovative idea .
Start Date: 04/01/2022
End Date: 30/10/2022
Bareilly smart city is committed to provide the smart solutions, BSCL came with an innovative idea of Car parking at 4 important locations. These parking facilities are designed to optimize space and reduce congestion in Urban areas
205 nos. Vegetable vending Stalls, Entrance Gate way, RO Plant and drinking water unit in 2 locations.
Start Date: 15/11/2021
End Date: 30/10/2022
205 nos. Vegetable vending Stalls. Entrance Gate way, RO Plant and drinking water unit in 2 locations.
Sensor Based Flush and Sensor Based Automatic Lighting, Waterless Operations for Urinals, Female/ Male.
Start Date: 24/12/2020
End Date: 30/10/2022
Sensor Based Flush and Sensor Based Automatic Lighting. Waterless Operations for Urinals. Female/ Male / Handicapped Toilets. Sanitary Pad Vending Machine & Incinerator
Bareilly Smart city redeveloped the existing internal roads with drain, ambient lighting, footpath.
Start Date: 30/04/2021
End Date: 30/10/2022
Bareilly Smart city redeveloped the existing internal roads with drain, ambient lighting, footpath and pedestrian facility. Construction of drain, Construction of pedestrian, Lighting poles and Signages
District hospital is divided in two wings (Operation ward and ICU) along the both side of roads.
Start Date: 15/07/2021
End Date: 15/12/2022
District hospital is divided in two wings (Operation ward and ICU) along the both side of roads. This project will provide the smooth movement of patient from one ward to another ward without traffic disturbance and ensure the safety of patients. Lift and Accelerator installed on both side
Existing library has been updated as smart library with the seating capacity of 50 peoples
Start Date: 01/11/2021
End Date: 30/12/2022
Existing library has been updated as smart library with the seating capacity of 50 peoples in Air condition room, 13 Nos of Computers and free Wifi and 800 Books
Construction of e-kiosk for citizen facility center with shops and advertisement area.
Start Date: 11/05/2021
End Date: 30/12/2022
Construction of e-kiosk for citizen facility center with shops and advertisement area.
AC Waiting area with adequate and comfortable seating arrangements’ Feeding Cabin, Lockers Clean toilets.
Start Date: 07/09/2021
End Date: 30/12/2022
AC Waiting area with adequate and comfortable seating arrangements. Feeding Cabin, Lockers Clean toilets, Dustbins And RO Drinking Water Children Play Area and caretaker, Sanitary Pad dispenser and disposal facility
Bareilly smart city undergrounded the LT & HT cables of ABD area. This project is implemented in 5 phase.
Start Date: 15/04/2022
End Date: 15/03/2023
Bareilly smart city undergrounded the LT & HT cables of ABD area. This project is implemented in 5 phase, under this project Cables are undergrounded, shifting of transformers to appropriate location to enhances safety by reducing the risk of accidents and weather-related outages. it improves the appearance of urban and suburban areas, as unsightly overhead lines vanish. Underground lines enhance reliability, as they are less susceptible to weather damage and falling objects
Construction of G+1 Building at maulana Azad college to facilitate students with updated infrastructure.
Start Date: 30/04/2021
End Date: 31/03/2023
Construction of G+1 Building at maulana Azad college to facilitate students with updated infrastructure. 5 Labs and 6 Classes
Construction of 50 m Outdoor Shooting Range, 25 m Outdoor Shooting Range, 10 m.
Start Date: 20/11/2021
End Date: 15/04/2023
Construction of 50 m Outdoor Shooting Range, 25 m Outdoor Shooting Range, 10 m Indoor Shooting Range. Control Room & Media Room, Equipment Center & Armory. Meeting room, Jury room, Multipurpose Halls, VIP Lounge
Landscape scope includes procure, supply, construction, installation, furnishing.
Start Date: 15/04/2022
End Date: 22/03/2023
Landscape scope includes procure, supply, construction, installation, furnishing, equipping, testing, commissioning and execution of landscaping works [softscape], irrigation for entire building complex including mockup for Landscaping items
Developed Shopping areas of different sizes, Parking spaces for 2 wheelers and 4 wheelers
Start Date: 05/01/2022
End Date: 22/03/2023
Developed Shopping areas of different sizes and Parking spaces for 2 wheelers and 4 wheelers
Construction of road, drains, smart road and junction development with ambient lighting.
Start Date: 29/06/2021
End Date: 31/03/2023
Construction of road, drains, smart road and junction development with ambient lighting, signages and vertical garden
Construction of road, drains, smart road and junction development with ambient lighting.
Start Date: 08/07/2021
End Date: 31/03/2023
Construction of road, drains, smart road and junction development with ambient lighting, signages and vertical garden
Construction of road, drains, smart road and junction development with ambient lighting.
Start Date: 07/10/2021
End Date: 30/09/2023
Construction of 400 seater auditorium and Incubation center with cafeteria and Basement parking of capacity of 120 Cars. Meeting Room, Training Centre, Conference room, VIP Lounge, Artist Room etc. 3 Nos of Lifts
For achieving revitalization and development of Bareilly city, following are the objectives of sky walk.
Start Date: 15/04/2022
End Date: 30/11/2023
For achieving revitalization and development of Bareilly city, following are the objectives of sky walk at Patel Chowk. Provision of around 150 Kiosks on the Skywalk for Commercial Purposes
Multipurpose Hall of size 42.5X27 Mt. Sports shall be played like: Handball, Volleyball, Basketball
Start Date: 18/11/2021
End Date: 30/10/2023
Multipurpose Hall of size 42.5X27 Mt. Sports shall be played like: Handball, Volleyball, Basketball, Judo, Badminton, Table Tennis & other sports in various combination.
Construction of road, drains, smart road and junction development with ambient lighting.
Start Date: 23/11/2021
End Date: 30/10/2023
Construction of road, drains, smart road and junction development with ambient lighting, signages and vertical garden
Construction of road, drains, smart road and junction development with ambient lighting.
Start Date: 07/09/2021
End Date: 30/12/2023
Bareilly haat shall provide the ambience of a traditional Urban Haat for the artisans and citizens of Bareilly. Food and Craft Bazaar to showcase Indian culture, handicrafts and a unique bazaar to display the richness of Bareilly’s culture. Bareilly haat provides platform to local artisans to promote selling ethnic and handmade products of Bareilly region.
Ghantaghar and kutubkhana is old market with very narrow passage of road cause heavy traffic jaam
Start Date: 02/09/2022
End Date: 31/12/2023
Ghantaghar and kutubkhana is old market with very narrow passage of road cause heavy traffic jaam, to eliminate such problem kutubkhana flyover is under construction
3D mural art, is an innovative form of artistic expression that transforms flat walls into immersive, lifelike environments.
Start Date: 22/05/2023
End Date: 21/11/2023
3D mural art, is an innovative form of artistic expression that transforms flat walls into immersive, lifelike environments. These intricate paintings create optical illusions that seem to leap off the surface, engaging viewers with depth and dimension
Project focuses on creating a functional, safe, and comfortable environment for shooting sports enthusiasts.
Start Date: 21/06/2023
End Date: 20/12/2023
Project focuses on creating a functional, safe, and comfortable environment for shooting sports enthusiasts. The design typically incorporates soundproofing materials to minimize noise, ensuring a tranquil atmosphere. Bullet-resistant walls and safety measures are critical, emphasizing safety within the shooting range. Adequate lighting, ventilation, and climate control systems are integrated for optimal shooting conditions. The interior often includes designated shooting bays, equipment storage, and a control room
The construction of a food court involves creating a versatile dining space where a variety of food vendors.
Start Date: 14/08/2023
End Date: 13/11/2023
The construction of a food court involves creating a versatile dining space where a variety of food vendors can operate. Key elements include a spacious open layout with food stalls or kiosks, shared seating areas, and efficient kitchen spaces for vendors. The design emphasizes functionality, with proper ventilation, fire safety measures, and sanitation infrastructure